"

yy彩票网页版登录地址-yy彩票登录官网首页拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,yy彩票网页版登录地址-yy彩票登录官网首页更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,yy彩票网页版登录地址-yy彩票登录官网首页让您尽享娱乐、赛事投注等,且无后顾之忧!

"

 

Jinsha River Xiangjiaba Hydropower Station
Time:2013-10-11 12:53:29        Word size: Small Middle Large
 

1.  Project Overview:Concrete gravity dam, the height of the dam is 161 meters,total installedcapacity is 6 million kilowatts, the total storage capacity is 5.163 billion cubic meters. The project is the hydropower station at the end of the Jinsha River.

Undertaken project:Phase one project of the concrete production system at the right bank, Phase two civil work and manufacture and installation of metal structure of the main body.

 

Copyright ? 2013 by Sinohydro Bureau NO.4 Co.,Ltd. All Rights Reserved

yy彩票网页版登录地址-yy彩票登录官网首页