Yellow River Longyangxia Hydropower Station
Time:2013-10-08 20:49:11        Word size: Small Middle Large

 

Project overview:Gravitational concrete dam. Its maximum height and total generating capacity are 178m and 1.28 million kilowatts respectively. Its reservoir capacity stands at 24.7 billion cubic meters. The station was commenced in 1987. Its first generation unit was put into operation in September 1987. The project was completed in 1992.

Undertaken project:The entire project.