Project Overview:Gravitational concrete dam: its maximum height and total generating capacity are 105m and 1.08 million kilowatts respectively. Its reservoir capacity stands at 896 million cubic meters. This hydropower station is the first cascade hydropower station across the the north trunk stream of the Yellow River and won the “China’s Quality Project Prize” issued by China Water Engineering Association in 2005.
Construction period:Main works of this project was commenced in October 1994. Its first generation unit was put into operation in November 1998. The project was completed in September 2002.
Undertaken Project:Some front-end projects, main body construction, and installation of three generation units.